Thursday, June 20, 2019

Byetree procurement strategy Essay Example | Topics and Well Written Essays - 5500 words

Byetree procurement strategy - Essay ExampleHowever, this changed and went beyond the old practices when the UK government became active in the advance of sustainable development and combating climate change (AECOM, 2012). In addition, the highway customers/consumers have become discerning on the quality and quantity of MSA services. It is a great scrap for the Baytree void Plc, which is the developer of a proposed MSA, to design and build the facilities in accordance with the existing Building and Environment Regulations of UK, and customers demands and expectations. Therefore, it is in this context that the Baytree Plc has determined the type of procurement manner to be applied in swan to mitigate the manifestation and engineering risks as well(p) as to make total sustainability and environment-worthiness of the project. Key Procurement Issues for Baytree Leisure Plc Procurement process for Baytree in the development of Motorway Services Area (MSA) is covered by the UK stan dard with the goal for an efficient and streamlined approach. To meet and achieve satisfying result, the project will integrate all members/key people in the procurement chain which included the project owner, contractors, sub-contractors and the customers. A closer work experience between Baytree and its general contractor and specialty contractors may yield better results in favor of the requirement of customers. Customers in this instance are the capricious public not only in the area but also visitors. Their needs must be considered from the design process to the procurement in order to fully address time, live, and quality constraints if any. These are described in detail on the next discussion. Key procurement issues for Baytree for the construction and development of MSA in consideration of the requirements include but not limited to the design of sustainable and environmentally sound MSA details, integration of this design to the various stages, identifying locally avail able materials suppliers as well as well as professionals and teamworkers, and identifying alternative sustainable and environmentally sound supplies, materials and equipment, efficient delivery and storage. Design Process The design process employs strategies and systems to meet the following(a) Energy and environmental doing standards Maintain a view of the whole project as a seamless whole within the context of the neighborhood Understands that the project exists within the context of a natural ecosystem even in an urban setting Incorporation of interdisciplinary collaboration throughout the design and construction process Maximised performance through maintenance of air quality as natural as possible and increased use of natural or daylighting consolidation of all important construction and project design decisions and strategies prior to programming phase Optimised design choices through use of simulations, models, and other design tools Employment of life-cycle cost analys is in purchasing and general decision-making System must be easy to maintain and operate Equipment and systems must assure continued optimum performance Maintain well-documented performance to meet design intentions Resource-efficient construction operations

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.